Electrical
Electrical
SPECIAL ANNOUNCEMENT --
The following will be enforced beginning July 1, 2010:
1) Unless given Special Permission, to do otherwise, All Temporaries and Services installed in the City of Chattanooga will adhere to the EPB specifications. See Attached. Copies of the attached drawings will be available at the Inspection Office as well (1250 Market Street, suite 1000)
2) AFCI's will no longer be required to be installed in a panel change-out to existing wiring only
3) The City of Chattanooga adopted the 2011 NEC May 29, 2012.
Click Here for Drawings Requirements
Before digging in the parks or erecting a tent with stakes longer than 1 foot, you must notify the Tennessee One Call to mark public utilities and Chattanooga Parks Maintenance to mark any private utilities located within the potential digging area.
Adopted Codes
Boards
Board of Zoning Appeals
Building Inspection Services
Building - Commercial
Building - Residential
Electrical
Form Based Zoning
Gas/Mechanical/Plumbing Permits
Historic Planning and Zoning
Inspection Services
Land Disturbing
Landscaping
Plans review
Signs
Short-term Vacation Rental
Solar Panels
Stormwater Development Inspection Services
Subdivision Land Management Services
Street Cuts
Trade Licensing
Zoning